Sign Up E&G Newsletter
Name:
E-mail:
Tel:

History

Southwest Region Local Team

21.08.2019


Set up of full time Engineering and Commercial Team for the Sichuan Province with base in the city of Chengdu.

Metropoly Cold Chain Supply Center in Kunshan City for the Hong Kong Company Metropoly Holdings Limited.

26.04.2019

 
This project ensure E&G’s leading position as professional provider for deep freezing cold storage facilities. 

Lasalle Logistic Project in the city of Beijing

11.02.2019


This project is an extraordinary milestone for E&G since through the implementation of Innovative Design and Construction procedure, the project was awarded by the US Green Building Council (USGBC) with the LEED GOLD Certificate (Leadership in Energy and Environmental Design).

CheHeJia New-Energy Technology R&D Center in Beijing city for a total area of 65,785 m².

30.12.2018


 This project was implemented as EPC and completely designed with 3D Modelling by E&G.

Certification Achievement

10.2018


   Awarded Professional Contractor 1st-Class of Fire-fighting.
Professional Contractor 1st-Class of Construction Electro-Mechanical Installation Engineering.
Awarded Professional Contractor 2nd-Class of Waterproof, Anti- Corrosive and Heat Preservation Project.
Professional Contractor 3rd-Class of Urban and Road Lighting Project.
General Contractor 3rd-Class of Petrochemical Project.

GLP Logistic Park in Kunshan City for a total area of 20,582 m².

03.10.2018


This is the 15th project delivered in cooperation with the Singaporean Real Estate Company GLP Pte. Ltd.

GLP Logistic Park in Shenyang City for a total area of 95,072 m².

01.10.2018


GLP Logistic Park in Shenyang City for a total area of 95,072 m². This project is one of the biggest logistic park built in China in cooperation with the Singaporean Real Estate Company GLP Pte. Ltd. The park was also awarded as Best GLP Park in China in terms of quality and standards.

On the year 2018 E&G achieve the amazing performance of 11 projects all under construction during one single year and more than 250 employees between Management and Technical deployed in whole China Mainland!
 

CaiNiao Network Logistic, part of Alibaba Group - Distribution Centre Project.

11.10.2018

 
This is a fully automated logistic centre with high-end MHE (Material Handling Equipment) solutions.  

Company Business License’s scope extended

05.07.2018

Construction Engineering.
Highway & Railway Engineering.
Railway Engineering.
Port and Waterway Engineering.
Water Resources and Hydropower Engineering.
Petrochemical Industry Engineering.
Municipal Utilities Engineering.
Electrical Engineering.
Foundation Engineering.
Firefighting Facilities Engineering.
Steel Structure engineering.
Building Decoration Engineering.
Building Electrical Installation Engineering.
Building Curtain Wall Engineering.
City and Road Lighting Engineering.
Environmental Engineering Construction.
Landscaping Project Construction.
Construction Engineering Design.
Project Management and Consulting Services
.

Japanese Speaker Team

12.06.2018


Set up of full Japanese speaking service in order to provide more efficient support to Japanese partners.

Certification Achievement

21.03.2018


 Awarded Liaoning province ‘’Credit Rating 3A Enterprise’’.

Beijing-Tianjin-Hebei Local Team

12.02.2018

Set up of full time Engineering and Commercial Team for the Beijing-Tianjin-Hebei Area with base in the city of Beijing.

Certification Achievement

23.06.2017


    Professional Contractor 2nd-class of Fire-fighting.
Professional Contractor 1st-Class of Building Decoration.

Woerwag Coatings Co., Ltd.

12.06.2017


‘’Class A’’ Chemical Plant Project, the second Chemical Project completely designed with 3D Modelling for Civil and Process part.

E&G’s Company Registered Capital reached 100 Million Yuan.

05.04.2017

E&G’s Company Registered Capital reached 100 Million Yuan. 

Company Business License’s scope extended

04.2017


   Construction Engineering.
Highway & Railway Engineering.
Port and Waterway Engineering.
Water Resources and Hydropower Engineering.
Petrochemical Industry Engineering.
Municipal Utilities Engineering.
Electrical Engineering.
Foundation Engineering.
Firefighting Facilities Engineering.
Steel Structure Engineering.
Building Decoration Engineering.
Building Electrical Installation Engineering.
Building Curtain Wall Engineering.
City and Road Lighting Engineering.
Environmental Engineering Construction. 

Shangdong Province Local Team

03.2017


Set up of full time Engineering and Commercial Team for the Shangdong Province with base in the city of Qingdao. 

Dalian XiangXiang Seafood Co., Ltd.

10.01.2017


Seafood Process Facility Project, the plant includes Cold Storage Room able to reach - 60 Celsius Degree. This project is a great achievement and is a milestone since confirmed E&G in the Cold Chain market as qualified professional provider for deep freezing cold storage room.  

Certification Achievement

07.2016


    Professional Contractor 2nd-Class of Building Decoration Project.
Professional Contractor 2nd-Class of Steel Structure Project.

BMW AG - Regional Distribution Center Project.

30.09.2016


This is BMW’s largest distribution centre in the North East of China. This centre served to rapidly improve efficiency and time delivery of logistics provider for BMW within the North East area. E&G’s core challenges were to provide large warehouse building by Custom-made dimensions with height of 14.26m and extremely flat flooring standard (FF60). 

E&G Company officially registered under the actual name of E&G Engineering & Construction Co., Ltd.

12.05.2016


E&G Company officially registered under the actual name of E&G Engineering & Construction Co., Ltd. By this, E&G consolidate its position as leading Construction Company for whole China Mainland market since present in more than 5 Provinces. 

Daimler-Benz AG - Distribution Center Project in Chengdu City.

28.04.2016


With this project E&G totally reach presence in more than 5 provinces of China Mainland market. 

Certification & Membership Achievement

04.2016

  
   Dun Bradstreet Registered Certificate Enterprise.
Dalian Green Building Association

Sungrow-Samsung Workshop & Office facility project in Hefei

08.10.2015


This Company it’s a Joint Venture between the Chinese Sungrow Power Supply Co., Ltd. and the Korean Samsung SDI Co., Ltd.
The plant is designed for the development, production and sales of lithium ion battery packs, energy storage converters and energy storage systems for on-grid electric power.
This project is an important milestone since E&G0’s first project delivered in the province of Anhui. 

Threebond Technology Dalian Co., Ltd.

18.03.2015


Class A Chemical Plant Project, this is the first E&G’s  Chemical project implemented as EPC and completely designed with 3D Modelling for Civil and Process part.

Sam’s Club Inc. - Commercial Building Renovation Project, Sam’s is part of Walmart Inc.

18.03.2015


Sam’s Club Inc. - Commercial Building Renovation Project, Sam’s is part of Walmart Inc.

Shenyang Branch Office Opening

15.07.2014


Subsidiary office opening in Shenyang, including a full time team of technical and management employee.

Shenzhen Suntak Circuit Technology Co., Ltd. - Production, R&D Center and Office facility.

12.11.2014



This project includes an ‘’ISO Class 7’’ Cleaning Room and a full floor designed for the building’s special HVAC system.

E&G’s Company Registered Capital reached 60 Million Yuan.

12.03.2014


E&G’s Company Registered Capital reached 60 Million Yuan.

Certification Achievement

03.2014


    Professional Contractor 3rd-Class of Building Decoration.
General Contractor 3rd-Class of Municipal Project.
Professional Contractor 3rd-class of Foundation and Underground Project.
Liaoning province credit rating 2A Enterprise.

Company Business License’s scope extended

12.2013


    General Contractor of Building Project.
Municipal Public Works Construction Service.
Decoration Engineering Construction Service.
Earthwork Engineering Construction Service.
Sports Facilities Construction Service.
Steel Structure Engineering Construction Service.

Morgan Ceramics Co., Ltd.

15.05.2013


Morgan Ceramics Co., Ltd. - Production Workshop & Office Building Project.   

Certification Achievement

01.2013


    General Contractor 2nd-Class of Building Project.
Professional Contractor 3rd-Class of Steel Structure Project.

Dong-Feng Nissan Dalian Co., Ltd.

21.09.2012


Dong-Feng Nissan Dalian Co., Ltd. - Workshop and Office Facility Project for the Chinese-Japanese JV Company in Dalian. 

Company Headquarter Relocation

01.03.2012


Due to the extraordinary volume of projects and increasing number of professional employee, E&G Company moved the Headquarter office to the current location at the International Business Center of Dalian Free Trade Zone.

Launch of BIM (Building Information Modeling) Technology

08.2011


BIM (Building Information Modeling) Technology officially adopted by E&G’s Design Team.
Up to 2019, E&G already implemented through BIM Technology more than 11 projects including two Class A Chemical Plant with very high complexity MEP requirement. 

Yangtze River Delta Area - Local Team

04.2011


Set up of full time Commercial Team for the Shanghai Area with base in the city of Shanghai. 

Company 10th Year Anniversary

08.04.2011


Within ten years E&G’s number of employee increased to more than 100 employee and achieved a leading position as construction partner for any of the international companies active in the Liaoning Province.

E&G’s Company Registered Capital reached 35 Million Yuan

18.10.2010



      E&G’s Company Registered Capital reached 35 Million Yuan !

Company Business License’s scope extended

03.2010


   Architectural Engineering Construction.
Mechanical & Engineering Installation.
Project Management services.
Construction Engineering Consulting services.

Certification Achievement

28.01.2010


   Professional Contractor 3rd-Class for Mechanical & Engineering Project Installation.
Professional Contractor 3rd-Class for Earthwork Engineering.
Professional Contractor 3rd-Class for Sports Facilities Engineering.

STX Shipbuilding Co., Ltd. - Headquarter Building Project.

31.12.2009


 Due to the extraordinary project execution in terms of quality and standards, this project was awarded with the acknowledgement of ‘’China National Quality Building’’.

Volkswagen Automatic Transmission Co., Ltd. Dalian City - Facility Renovation Project.

15.08.2009


This project was awarded with an Appreciation Letter from the local GM in order to express the gratitude on the extraordinary project delivered.

Certification Achievement

26.05.2009


ISO Certification for Quality Management, Environmental, Health & Safety.

GE Coverteam Rotating Machine (Yantai) Co., Ltd. - Production Workshop Project.

12.07.2008


This is the first of many further projects delivered by E&G in the Shangdong Province.

Achievement of "Contract First, Credit First Enterprise" Award from the Dalian Local Government.

10.07.2008


Achievement of "Contract First, Credit First Enterprise" Award from the Dalian Local Government. 

Sigma Elevator (Dalian) Co., Ltd. - Elevator Test Tower Project.

29.06.2008


 This project is the first of many R&D centre in China, this project distinguish itself for the complexity of the building elevation, up to 55 meters from the ground. 

Beginning of Cooperation with Prologis-GLP in China

12.11.2007

E&G starts the first project cooperation with the US Company Prologis, Inc. for the Prologis DaYaowan Logistic Park in Dalian and consequently on 2009, once the business unit for China and Japan market were sold, with the Singaporean Real Estate Company GLP Pte. Ltd. Up to 2019 E&G already designed and built more than 500,000 m² for around 15 within Industrial and Logistic park in China Mainland in cooperation with GLP.

E&G Company officially registered under the name of E&G Construction & Engineering (Dalian) Co., Ltd.

11.06.2007


E&G Company officially registered under the name of E&G Construction & Engineering (Dalian) Co., Ltd. 

Bosch Chassis System (Dalian) Co., Ltd. - Foundry Workshop, Office Building and Aluminum Foundry (Phase II) Project.

31.05.2005


E&G’s first complete EPC project achieved for a fully owned foreign Company in China. Up to 2019, E&G totally has delivered more than 30 full EPC projects and cooperated with partners from more than 10 countries, such as USA, UK, Japan, Italy, Germany, France! 

Dalian Ryosei Automotive Components Co., Ltd. - Car Parts Workshop Project.

22.07.2004


Ryosey is a subsidiary of the Japanese Company Mitsubishi Cable Industries. 

This is the first project delivered for an Automotive foreign Company by E&G in China. Up to 2019, E&G totally has delivered more than 20 projects for Automotive Companies.


Company Headquarter Relocation

03.20.2004


Due to the increase of business volume, E&G’s Headquarters was moved to Hongmei South Street of the Dalian’s Free Trade Zone (KFQ).

E&G Company established in Dalian City

04.08.2001


Mr. Bai YingJie, E&G’s President and owner, with a team of 20 employee from management and engineering background set up E&G Company in the Dalian’s Free Trade Zone (KFQ).

Since the beginning, E&G Company distinguished itself for the efficiency and professional service provided as Contractor for the Japanese, USA and Korean Companies in the Liaoning Province.