Acceptance & Maintenance Testing are critical steps in the installation and start-up process of an equipment, system, or plant and equally important throughout the equipment life to ensure safety and optimum operation. The main purpose is to achieve the minimum breakdown and to keep the plant or building in best working condition in terms of safety and efficiency at the lowest possible cost. In E&G we adopt a ‘’Continuous Improvement Policy’’ and we strictly follow comprehensive Standard Operation Procedure (or briefly SOP) in order to performing a successful acceptance and maintenance process using the prescribed practices and procedures for serviceability and reparability.
In our Scope of work (SOW), we can provide:
l Pre-commissioning test of the system;
l Equipment Commissioning plan and procedure;
l Performance and functional test of the system;
l Documentation for Operation & Maintenance Manual (including as built documents);
l Trainings on site;
l BIM Handover Model;
l Building Management System (BMS);
l Defects & periodic Audits Servicing;
No.201, Huanghai West 4th Road,
Free Trade Zone, Da-lian, Liaoning,
116600, China
+86 (411) 8792 1638
stephen.fisher@engchina.com
+86 186 9869 0794
davide.gamucci@engchina.com
+86 136 9134 2402
austin.xing@engchina.com
+86 185 1505 2293
daisy.yang@engchina.com
+86 186 2444 3739
austin.xing@engchina.com
+86 185 1505 2293
daisy.yang@engchina.com
+86 186 2444 3739